What Should Be Paid Attention To When Installing High Pressure Blower

The high-pressure blower adopts internationally advanced design technology, uses precision processing equipment, and is mass-produced by automatic standardized flow operation. The internal motor is made of high-temperature resistant insulating materials, which can ensure the safe operation of the motor in a high-temperature environment without burning the machine. It does not age. After purchasing the fan and receiving the goods, how to install the high-pressure blower during installation, or what to pay attention to when installing the high-pressure blower, we need to pay attention to the following points:

1. When the air inlet and outlet of the high-pressure blower are connected to the pipeline, it is better to use a hose connection in the middle to avoid vibration of the fan. Refer to when installing the pipeline: How to match the pipeline with the high-pressure blower to avoid overload and overload operation of the fan, and pull the fan instantaneously The temperature that can be withstood, reference: What to do if the temperature of the high-pressure fan suddenly rises

2. For occasions with high noise requirements, a high-pressure blower silencer can be added according to the site conditions (in general, it can eliminate about 10 decibels), and the silencer is installed at the end of the air inlet pipe or the air outlet pipe., It can also be added to the silencing speaker with built-in silencing sponge, which can achieve great noise reduction effect, but it is necessary to pay attention to the distance between the high-pressure blower and the cabinet, as well as the ventilation and heat dissipation of the high-pressure blower, and reserve heat dissipation holes for installation. A small fan helps to dissipate heat, refer to: Silencing method of high-pressure blower

3. When installing the fan, use flat washers and spring washers to tighten the screws to prevent loosening after long-term operation.

4. It can use rubber buffer to bear the weight of the high-pressure blower, especially the 2GH920/high-power 25kw high-pressure blower.

5. Requirements of the installation site: the surrounding temperature and humidity should meet the following conditions:

Three-phase 10~40℃, single-phase 5~40℃, relative humidity below 85%.

Choose a well-ventilated place with little dust and humidity. If there are many impurities in the operating environment, a high-pressure fan air filter assembly must be installed to ensure the cleanliness of the air and prolong the service life of the fan.

Please install it indoors or in a place with obstructions, not in the open air.

6. After everything is installed, power on to confirm the direction of rotation is correct:

Reference: The wiring diagram of the high-pressure blower. After the wiring is completed, turn on the switch (instantly) to confirm the direction of rotation and whether there is noise. The direction of rotation is indicated by the arrow on the blower. If the direction of rotation is incorrect, the order of air suction and air supply will be reversed. If it is three-phase, replace any two of the three external wires.

7. Grounding To prevent accid